Delivering innovative, sustainable, and high-impact engineering solutions tailored to your exact project requirements.
The port and harbour play a vital role in the economy by providing a place for ships to dock and unload cargo. They are a major source of revenue for the government. IED understands the power of these front door of the country. So IED always priority to do contribution along with best expert in this field.

Port & Jetties
The port and harbour play a vital role in the economy by providing a place for ships to dock and unload cargo. They are a major source of revenue for the government. IED understands the power of these front door of the country. So IED always priority to do contribution along with best expert in this field.
Explore real-world engineering projects completed within this domain.

The Bangladesh Inland Water Transport Authority (BIWTA) plays a pivotal role in the development, maintenance, and operation of inland river ports and terminal facilities across the country. With a mandate to enhance accessibility and convenience for the populace, BIWTA continuously undertakes initiatives to modernize and expand its infrastructure. In line with the strategic vision of the Bangladesh Economic Zones Authority (BEZA), a comprehensive project titled "Establishment of Jetties and Infrastructure at Mirsarai & Sandwip in Chittagong, Subrang-Jaliar Dwip at Teknaf, and Sonadia Dwip at Cox's Bazar" has been formulated.

Mir LPG Plant Design including jetty project is a comprehensive engineering project that involved designing a Liquid Petroleum Gas (LPG) plant, with jetty and river embankment protection design

This project aimed at designing a jetty and embankment protection system for a power plant located near a river.

Unitex LP Gas has its mother LPG plant based in Shitakundu in eastern part of the country is also in same location.

It's almost 3742 acre. we have done the full area drone survey. we designed the embankment along with landscape, paved area & walk way. We have to provide 15 years embankment assessment report and our technical advice.

It's almost 1500 acre. we have done the full area drone survey. we designed the embankment along with landscape, paved area & walk way. We have to provide 15 years embankment assessment report and our technical advice.